Furthermore, all our creation processes are in compliance with ISO9002 expectations. Hangzhou EPG Co.,Ltd. , was started in November, 1997. With its 5 wholly owned subsidiaries. Due to our vast solution variety and wealthy activities in this market,
Product Description
1PC Stainless Metal Wafer Variety Ball EPT with ISO5211 Mounting Pad (Q41F)
Functions and Rewards:
- Blow-out Evidence Stem
- Anti-Static Unit for Ball-Stem-Human body
- Pressure Stability Gap in Ball Slot
- 2 Belleville Washer to Self-adjust EPTT
- ISO 5211 Immediate Mounting Pad for EPT EPTT
- Locking System Spring Manage , EPTT Design and style
- Fireplace-Risk-free Design Accessible
- Design and style stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd: AEPTE B16.34,API 608
- Wall Thickness stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd: EN12516-1
- Flange End:AEPTE B16.five Class a hundred and fifty/300, DIN 2653 PN10-PN40, JIS B2238 10K/20K
- Inspection amp Screening:API 598,EN 12266
Working / Check Circumstances:
- Temperature Variety:-20 ordmC to a hundred ninety ordmC
- Working Force: 10K/150LB~300LB/PN16~PN40
- Operating Medium: Drinking water, Oil, Gasoline, Acid, and so forth
- Flange Stop:AEPTE B16.5 ,Course one hundred fifty/300,DIN PN10-40,JIS B2220 10K/20K
- Design: EPTT/AEPTE B16.34
- Inspection ampTesting: API 598,BS EN 12266
Choices:
- Physique EPT:ASTM A351-CF8M,CF8, CF3,CF3M, ASTM A216-WCB,A105, and many others.
- Locking Gadget Spring Take care of Obtainable
- Fireplace-Protected Layout Obtainable
Merchandise Title | 1PC CF8M Wafer Flanged Stainless Ball EPT |
one. EPT | Stainless Metal 304/316/304L/316L ( CF8/CF8M/CF3/CF3M) |
2. Dimension | one/2”~4” ( DN15~DN100) |
3.Certification | ISO9001 amp CE |
4. Port | Entire Port |
5. Flange stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | DIN2633 |
six. Operating Pressure | PN16~PN40 |
7. Connection Ends | Wafer type |
8. Working Temp. | -20~300 ordmC |
nine. Suited Medium | Water, Organic Gasoline, Oil and some corrosive liquid |
10. Seal | PTFE, RPTFE, PPL |
eleven. Locking | Selection |
twelve. Inspection amp Screening | In accordance to API598 |
Cargo | |
Supply Time | fifteen~20 Times |
Package deal | StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd Exporting Plywood Circumstance |
EPT Port | HangEPT/ZheJiang , EPTT |
EPT Phrases | Exw, FOB, CFR, CIF, etc. |
Payment Terms | T/T, Western EPT, PayPal, and so forth. |
30% prepayment, 70% harmony paid ahead of shipping or towards duplicate of BL | |
Guarantee | 18 Months right after leaving factory |
Edge | OEM/ODM is applicable |
Others | We also manufacture Flange Ball EPT, Gate EPT, World EPT, Check EPT, Butterfly EPT amp Y Strainer |
EPT List:
Item | Element Title | EPT Listing | ||
1 | Body | CF8M | CF8 | WCB |
2 | Thrust Washer | PTFE | ||
three | O Ring | VITON | FKM | |
4 | V-Ring EPTT | PTFE | ||
5 | Gland | SUS304 | ||
six | Belleville Washer | SUS301 | ||
seven | End Nut | A194-8 | ||
8 | Quit Cap | SUS301 | ||
nine | Washer | SUS304 | ||
10 | Deal with | SUS304 | ||
eleven | Stem Nut | A194-8 | ||
twelve | Locking Device | SUS301 | ||
13 | Plastic Pin | Plastic | ||
fourteen | Handle go over | Plastic | ||
fifteen | Stem | SUS316 | SUS304 | |
16 | Anti-static System | SUS316 | SUS304 | |
seventeen | Ball seat | PTFE | RPTFE | |
18 | Ball | CF8M | CF8 | |
19 | Entire body gasket | PTFE | ||
twenty | Cap | CF8M | CF8 | WCB |
21 | Place Bolt | SUS304 |
Aggressive Benefit:
- eighteen Months Promise for top quality.
- OEM company, print client’s Logo on the valve human body.
- Timely shipping and delivery. 15 daEPTTfor stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd goods. thirty daEPTTfor non-stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd items to make new mould.
- a hundred% leakage test right after assembly.
- As a manufacturing facility, every generation method can be controlled throughout manufacture.
- Provide inspection amp testing studies for raw resources, creation procedure, wall thickness, face to experience dimension, force take a look at, welding check, painting check, and many others.
FAQ
Q1: We are fascinated in your merchandise?
A1: In orEPTTto recommend you suitable items, remember to provide element details, like dimension, substance, stress, product.
Q2: Is the prerequisite for MOQ?
A2: For some small size, like 1/4”-1”(DN6-DN25), it ask for the MOQ is 50pcs for each and every dimension. EPTTly sEPTing, it is dependent on your purchase.
Q3: How about the warranty?
A3: The guarantee time is eighteen months soon after leaving our factory. We can mend or change due to the fact of the high quality difficulties.
This fall: Payment
A4: Primarily T/T, Western EPT amp PayPal are applicable for us. Payment Expression: thirty% prepayment, 70% balance paid ahead of shipping or in opposition to copy of BL.
Q5: Can you manufacture distinct stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds valves in accordance to customer demands?
A5: Of course. We can manufacture API,DIN,GOST,JIS stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds for diverse force amp temperature amp dimensions according to diverse demands.