we have attained the believe in of purchasers throughout the world. Provider & High quality controlWe provide comprehensive drawings and supply each time needed. PersonnelOur income people are effectively educated to accommodate your requests and communicate English for your usefulness. Merchandise description:
Product DSG51 CNC hose crimping EPTT has geared up with personal computer numerical handle method, rapidly crEPTT and very good quality. This EPTT attributes high crEPTT accuracy, massive force, lower sound and easy to function. It can make the mould foundation division to be a lot more even through the double inclined aircraft 8-flap mould seat outfitted with a substantial precision XiHu (West EPT) Dis.Hu (West EPT) Dis. unit. DSG51 CNC hose crimping EPTT is largely employed for crimping processing for substantial force EPT hose assembly in the mechanical engineering. It can also be used for crimping steel pipes, eEPTTly massive pipes and irregular condition pipes.This EPTT characteristics small and moveable look, huge power, lower sound and simple to function. The buckling volume can be specific adjusted through a scale. It can make the mould foundation division to be more even by means of the double inclined airplane eight-flap mould seat geared up with a large precision XiHu (West EPT) Dis.Hu (West EPT) Dis. gadget.
Set up and Procedure
1. Insert adequately 70 liters of Excellent Wall model forty six# anti-abrasion EPT oil. If the space temperature is reduced than ten ordmC, 10% transformer oil is require to add.
Join the electric source properly as for every the EPTT specifications, to make the route of the motor rotation to be consistent with the rotation path marking, and grounding defense shall be completed.
two. Regulating the scale
The scale is employed for regulating the quantity of the buckling. When it is controlled clockwise, the buckling sum will reduce, when it is controlled anticlockwise, the buckling amount will improve. The scale is connected jointly with oil cylinEPTTend include through a few socket head screws and 3 EPTs on the scale base. When employing a hand to pull the scale (vertical to the oil cylinEPTTend include route), the scale can fleXiHu (West EPT) Dis.bly depart from the oil cylinEPTTend protect. When releasing the scale, the scale will be recovered relying on EPT drive. Ahead of the EPTT is turned on, examine meticulously if the scale telescoping is fleXiHu (West EPT) Dis.ble and if the direct link is reliable.
3. The primary scale is turned inside of line of the secondary scale, turn the EPTT on for examination run, and observe if all steps are standard. If when the piston conducts reciprocating movement, there is a crawling phenomenon, the bleed screw on the oil cylinEPTTtop shall be unscrewed for exhausting air.
four. Stress regulation
The buckling force and opening mould force will be regulated by means of two knobs at the back of the oil cylinEPTT(see figure), when it is regulated clockwise, the force will boost, when it is regulated anticlockwise, the stress will lessen (The strain has already been well regulated when ex-manufacturing facility).
5. Operation
Primarily based on the measurement of the rubber hose to be buckled, decide on appropriate mould as for every the specialized parameter reference desk of the locking pipe and mount it on the mould base. Controlled properly the scale placement as for each the info in the info in the table, the pipe locking can be carried out. Following pipe locking, use a vernier caliper to mease the exterior diameter dimension of the pipe sleeve after buckling to see if it fulfills the reference table knowledge of the parameter. If it does not meet the information, the scale shall be precisely controlled right up until it fulfills the specifications. Due to the fact the manufactures of the pipe sleeve are different, so, distinct dimension, materials, hardness and so on are undoubtedly not the identical. These aspects would result various influences on the pipe locking consequence, for that reason, the information in the desk is only for reference, the comprehensive knowledge take the strain take a look at as the basis.
Notices
- When buckling, make the joint to track down the mould cEPTTr as a lot as attainable, the joint is not buckled on the hex nut.
- Stop device and other international matter from EPTTring the locking head.
- Right after the function is finished for every single time, the 8-block mould foundation should be made to increase to the biggest extent, this can make the EPT to be at extension position. If not, the EPT will be damage.
- When functioning, the hand need to not extend into the locking head.
- The EPTT provide must be switched off when servicing is completed.
Servicing
- We will give a assure to preserve the EPTT in excellent fix inside 3 years from the working day when the EPTT is bought. All fitting troubles will be totally free of demand fixed (or changed if required) during the promise period. The damage resulted from improper use o accident damage does not beEPTT to free of charge fix selection.
- The EPT oil in the oil tank must be usually checked, if oil sum is identified to be insufficient, the oil shall be timely supplemEPTTd. If the oil liquid is polluted, it shall be filtered or replaced.
The locking head shall maintain internal cleanliness. Keep away from the international matters throughout processing to EPTTr into the locking head oil cylinEPTTvia the mould to have an effect on the regular use. Wipe out the international matters, which are brougEPTT by the mould physique in time when buckling the joint.
Regularly fill appropriate grease into the mould body for lubrication.
Assure
We will offer a assure to hold the EPTT in great fix inside of 3 years from the day when the EPTT is acquired. All fitting difficulties will be cost-free of cost repaired (or changed if necessary) during the ensure time period. The injury resulted from inappropriate use o accident hurt does not beEPTT to cost-free of demand mend selection.
Troubleshooting
Difficulties phenomena | Difficulty explanation | Reducing technique |
EPTT has not motion | Oil tank has not been stuffed with oil | Fill oil as for every necessity |
EPT rotation direction is not proper | Control two stage lines | |
Electric difficulty | Overhaul electric powered circuits | |
Scale is damaged | The scale is mounted on the oil cylinEPTTend experience by the screw | Regulate the scale as for each the instruction to make scale to telescope freely |
Conductor at scale location is connected with scale | Anew join the scale conductor to make it to be insulated from scale base | |
Electric powered problems | Overhaul electric circuits and electric powered elements | |
Scale conductor reducing | Anew connect scale | |
Technique strain is excessively low | Modify buckling stress-regulating valve | |
No buckling | The valve main of solenoid reversal valve is seizured by international issues | Dismount solenoid reversal valve, use gasoline to clear the valve core. |
Electrical difficulty | Overhaul electric powered circuits | |
EPT is not opened | Opening mould stress is excessively minimal | Change opening mould force regulating valve |
Electrical difficulties | Overhaul electric powered circuits | |
Massive sound | Installation is not steady | Conduct horizontal stable installation |
EPT oil is excessively filthy | EPT or alter it | |
EPT is blocked | Use gasoline to clear the filter | |
EPT foundation crawls | Gasoline in the EPT oil has not bee fatigued entirely | Suited unscrew the bleed screw, make the piston in the oil cylinEPTTto move again to previous position to exhaust gasoline, then screw down bleed screw. |
Lubrication is poor | Smear grease on the functioning inclined experience of mould base | |
Oil leakage | EPTt is not tightened closely | Tighten the oil pipe joint |
EPT washer is broken. | Replace sealing washer. |
Our support:
Pre-EPT Support
* Inquiry and consulting assist.
* Sample testing help.
* Look at our Factory amp Workplace.
After-EPT Service
* Guarantee for 3 many years.
* Training how to instal and use the EPTT.
* Supply free fast-use component.
Payment Term:
EPT Assurance
* Pay out to our company’s CITIBANK account specified by Alibaba.com with credit rating card or lender transfer.
* one hundred% solution high quality security 100% on-time cargo defense a hundred% payment protection.
T/T
* a hundred% T/T in EPT(regular models in stock).
* 50% T/T in EPT, stability paid out ahead of shipping(for the EPT designs).
Our manufacturing unit also have accept the payment by western union,paypal and cash gram.
FAQ:
one.Concern:Are you producer or investing organization?
Reply:We are manufacturer because 1997.
two.Query:Certificates ?
Reply:CE,ISO
three.Question:Shipping time?
Reply:The EPTTs arein inventory now,can be sent as you need.
four.Query:What is theMOQ?
Answer:one set for you test.
five.Issue:Can I get some price reduction ?
Sure, good friend.The more you purchase, the much more you save.
six.Query:What is the payment?
Solution:T/T in EPT,as most of our crimping EPTT model are in stock.
L/C,western union,paypal and money gram also can be acknowledged.
7.Query:Can you make EPT designs or Emblem?
Of training course, we are skilled OEM manufacturer.
eight.Issue:Can I pay a visit to your manufacturing unit?
Yes,you are warmly welcome to visit our factory whenever. Before the going to, remember to contact us first of all and affirm the browsing time, our car can decide up you to our manufacturing facility.
Why choose EPTT Factory?
one.EPT EPTT CE UL ISO accredited DX68 hose crimping EPTT.
two.Wonderful Cost-effective guide hose crimping EPTT,EPTT EPTT you at any time have.
3.Samway create the hose crimping EPTT up to 800mm diameter hose with 2500 ton pressing power.
4.Fast shipping, our factory can dispatch the EPTT inside 24 hours as soon as EPT the payment and assure to ship nomally seven working times on board.
Discounts available with bulk purchase
Braided hose crimper DX68 Up to 2” 6SP R15 EPT Hose Compact in Measurement Affordable Wonderful EPTT
220V 240V one period 50/60hz, 380V/400v/415v/440v 3 section EPTT have inventory.
A wonderful economical braided hose crimper will crEPTT up to 2 quot 4SP/4SH EPT hose,the EPTT is equiped with latest EPT,EPT from SIEMENS company control program from SIEMENS,EPT EPT valves,NOK seal make the EPTT druable.
Finn EPTT series braided hose crimper are primarily for services and tiny generation purpose,inexpensive and compact in design,best for most of your demands in hose assembly.
Principal consumers:RYCO,PIRTEK,PARKER Usa,CATERPILAR etc.
OEM support:Our factory EPT hose crimping EPTT for sale up to thirty quot,crimping assortment up to 1000mm accessible,5000 ton crimping force.
Guarantee:Our manufacturing facility hose crimping EPTT supply three several years guarantee from date of buying.